What should a contractor do if a jobsite has more than the allowable limit of asbestos?

  1. Continue working with safety measures

  2. Contact OSHA for further instructions

  3. Remove the asbestos immediately

  4. Wet down the area and resume work

The correct answer is: Contact OSHA for further instructions

If a contractor discovers that a jobsite contains more than the allowable limit of asbestos, the appropriate action is to contact OSHA for further instructions. This is crucial because OSHA (Occupational Safety and Health Administration) has strict regulations and guidelines regarding the handling of hazardous materials, including asbestos, which is known to cause serious health issues. While safety measures are essential on any job site, merely continuing work without proper procedures in place could pose significant health risks to workers and others present. Similarly, removing asbestos immediately without proper training, certification, and adherence to regulations could lead to hazardous exposure and legal consequences. Wet down the area as a method to control airborne fibers may be a temporary measure during removal, but it does not replace the need to follow regulated procedures. Therefore, the correct action in such a scenario is to seek guidance from OSHA, ensuring that the situation is handled safely and in compliance with the law. This also emphasizes the contractor's responsibility to prioritize safety and legal obligations on job sites involving hazardous materials.